Pier Solutions to carry out LER FEED for Oilfield Service Provider

Engineering-graphic.PNG

Pier Solutions has been selected to carry out a Front End Engineering and Design (FEED) Study for an onshore pressurised oilfield LER. The study commenced in January 2018 and is due to be completed mid February. The specification is for an A60 40ft x 10ft unit with full CPFG, HVAC and integration of specialist electrical equipment.

Previous
Previous

DNV 2.7-1 workshop container call-offs